Section 3 Scenarios

length of time could depend on the manufacturer meeting the FM timetable. The selection of the testing facility is important not only for their expertise and knowledge of the tests to be performed but the relationship between the company and our team is important. Some of the tests to be performed (without knowing the full scope of the product uses would be:

ASTM C518

Fatigue and Thermal Cracking

ASTM F1987 Compression ASTMD2396 Permeability ASTM D7175 Dynamic Shear Rheometer ASTM 2369 VOC ASTM D2565 Accelerated Weathering ASTM D522 Flexibility ASTM D412 Elongation ASTM D638 Tensile Strength ANSI A118.10 Waterproofness ASTM D1970 Waterproof Integrity ASTM D3330 Peel Adhesion AAMA 711-13 Elevated Temperature Exposure

We would request crumb rubber of the range of sizes from the TDM supplier be shipped to the manufacturer to determine which material works best in their sample testing. Once the selection of the raw material requirements is established and the manufacturer is satisfied with their sample, we would initiate the agreed upon testing protocol that was identified to be beneficial to the manufacturer and within the budget and timeline of the Scope of Project. The heart of each Activity Plan will be embodied in three tables: A description of products to be supported by CalRecycle’s FCS Program (including details on product weight, crumb rubber percentages and mesh size, and projected sales and crumb rubber use); Information on anticipated challenges for each product and strategies for timely launch; and a schedule of manufacturer milestones (including consequences for not meeting milestones) and FCS assistance services. For brevity in this proposal, and because of the high-level nature of these scenarios that do not include many details, we present a simplified sample Activity Plan Summary Table here that seems plausible based on the information provided for Scenario A. We have combined all products into this sample plan at a high level. During the project, we envision separating our plans for different types of products. Table 5: Simplified Sample Activity Plan Summary for Building Production Scenario C

Milestone, Target Completion Date and Responsible Party*

Activity

Assumed Start Date

May 2022; assumed in scenario that the Manufacturer has not worked with crumb rubber previously. And this is for one product initially to better understand the prototype will meet the manufacturer’s requirements and then provided rate for three to five products.