crumb rubber use projections; develop a plan with specific goals, individual accountability, incentives for timeliness; identify potential roadblocks and strategies. Identify tests and certifications if known and/or estimate costs for the budgeted activities. It may be necessary to consult with technical experts for input on the proposed activity plans and budgets. Compile activity plans and summary information in a single report; identify issues of concern/priority to CalRecycle; collaborate to identify optimal use of contract resources to maximize results. Work with CalRecycle and participating firms to identify minimum qualification criteria for crumb rubber producers based on ASTM test results; quality systems, operational practices and commitments to work towards FCS goals. Contractor will provide a sample letter that the supplier would need to sign assuring Contractor and CalRecycle of the material size(s) that may be used. It is understood that when developing a product, it is not always known the exact particle size that will be used. It is understood that a Material Safety Data Sheet will be required from the supplier. On site sampling (extraction and collection) to address the sizes of material that may be available for the product manufacturers.
budgets, Summary Report, and technical assistance priority process.
2D. Prepare Summary Report and Amend Contract
2D. Summary Report, prioritized list of prospective manufacturers.
July – September 2022
2E. Qualify Processors
2E. List of qualified processors and testing results.
July 2022 – December 2022
P a g e 6 | 54
Made with FlippingBook flipbook maker